PLANNING. CONSULTATION. COORDINATION.
Major Works & Section 20 Support in Ilford
Successful major works begin long before anyone is on site. We help build a clear scope, coordinate decisions with the right specialists and keep residents informed at every stage, from early planning to final handover.
✓
Clear scope before tendering
✓
Section 20 consultation organised
✓
Residents kept informed on site
Before any works begin
The right preparation changes the project.
Good major works start with an honest picture of the building's condition. Reviewing existing surveys, maintenance history and reported defects helps separate what is urgent from what can be planned for later.
From there, we work with directors to agree priorities, shape a clear scope with appropriately appointed specialists, and consider how the work may be funded through budgets, reserves or service charge demands, in line with the lease.


Roof and building fabric
Roof coverings, brickwork, render, windows, gutters and external decoration that protect the building from the weather.

Shared spaces and redecoration
Entrances, stairwells, corridors, flooring and lighting refreshed in a way that suits how residents use the building.

Plant and systems
Lifts, door entry, fire safety installations, communal heating and electrics, planned with specialist input and access needs in mind.
SECTION 20 · LEASEHOLDER CONSULTATION
Consultation is part of the plan.
Major works are often the largest cost leaseholders face. Building consultation into the programme from the outset protects everyone and helps decisions stand up later.
Further reading: GOV.UK guidance on service charges and other expenses


The £250 threshold
Qualifying works where any one leaseholder's contribution would exceed £250, including VAT, normally require Section 20 consultation before the work proceeds.

The process depends on the project
The exact consultation steps depend on the nature of the works and the type of contract involved. There is no single fixed timetable for every building, so we plan the stages around your project rather than a template.

Reserve funds and consultation
Paying for works from a reserve fund does not automatically remove the requirement to consult. Funding and consultation are considered together, alongside the terms of the lease.
THE PROJECT JOURNEY
How a major works project moves from idea to handover
RBC coordinates the management of each stage. Surveying, design, engineering and technical sign-off are undertaken by suitably appointed specialists, so every decision rests on qualified professional input.

01
Define
Every project begins with evidence. We arrange for appointed surveyors and other professionals to assess the building's condition, then work with you to set priorities and draft a clear scope. The aim is a defined brief that reflects the lease, the budget and what the building genuinely needs.

02
Consult
Where works qualify, we manage the required leaseholder consultation, issuing notices, inviting observations and recording responses. The exact process depends on the works and the contract, so we explain each step clearly and keep leaseholders informed throughout.

03
Compare
Contractors price against the same specification so tenders can be compared fairly. We review scope, exclusions, programme, fees and VAT alongside the headline figure, and clarify assumptions with bidders before a recommendation is made.

04
Coordinate
Once appointments are confirmed, we coordinate the programme, access arrangements and communication between contractor, consultants and residents. Technical supervision remains with the appointed specialists, while we keep residents updated on progress and any changes.

05
Close
At completion, the appointed professionals confirm the works technically. We then gather the records, certificates and warranties where applicable, reconcile costs against the service charge accounts and hand over a clear file for the building's future planning.
PROCUREMENT
Compare more than the headline price.
Tenders are most useful when every contractor is pricing the same thing. We help compare offers against a common scope, ask contractors to clarify their assumptions, and set out the differences so decisions can be made on a like-for-like basis rather than on the lowest figure alone.

⌕
Scope and exclusions
Check that each offer covers the full specified scope, and read the exclusions and provisional sums closely. Items left out of one price can make it look lower than it really is.
⛉
Competence and insurance
Look for relevant experience with similar buildings, appropriate health and safety arrangements, and current insurance cover suited to the nature and value of the works.
▦
Programme and access
Compare proposed durations, working hours, scaffolding and site set-up, and how each contractor intends to manage access to homes and shared areas while residents continue to live in the building.
£
Fees and VAT
Make sure figures are compared on the same basis, including VAT, professional and supervision fees, and any contingency, so the total likely cost is clear to everyone contributing.
✪
Completion evidence and warranties
Confirm what will be handed over at the end: certificates, test results, photographs and manuals, together with any product or workmanship warranties where applicable.
RESIDENT COMMUNICATION
Keep residents part of the picture.
Works go more smoothly when residents know what is coming. We aim to share early information about the purpose of the project, the likely scope and when work is expected to begin, so nobody is surprised by scaffolding at the door.
Where contractors need access to flats, balconies or roof spaces, we help coordinate arrangements in advance. If the programme changes because of weather, findings on site or supply issues, we pass updates on as clearly and promptly as we can.
Throughout the works, residents should have a clear route for questions and concerns, with progress shared at sensible points through to completion.

Common questions
Q
When should planning start?
As early as practical. Larger projects can involve surveys, consultation and tendering before work begins, so starting well ahead of the intended programme gives more room for considered decisions.
Q
Who writes the technical specification?
Specifications are prepared by suitably appointed specialists, such as surveyors or engineers. RBC coordinates the process and keeps decisions moving; technical design and sign-off sit with the appointed professionals.
Q
Can reserve funds be used?
That depends on the lease, the purpose of the fund and the available balance. Using reserves does not automatically remove any consultation requirements that apply to the works.
Q
Can the final cost be guaranteed?
No. A well-defined scope and comparable tenders help reduce uncertainty, but hidden defects, scope changes and site conditions can affect the final cost. Any likely variations are explained as they arise.
Project enquiries
Tell us what’s planned.
Planning major works for your building? Tell us about your block and we'll be in touch.
It helps to know the building’s location and size, the works you have in mind, any surveys or reports already in hand, and where decisions currently stand. Share whatever you have so far, along with the best way to reach you.